Glacier Express
Lift
Front Side
Built 2000
A high-speed quad chairlift built in 2000 by Leitner. Replaced the Glacier Chair Triple (Murray-Latta, 1976–2000), which had run alongside the Olympic Chair to serve lower-mountain terrain from base to mid-mountain. Ran parallel to the later Friendly Giant Yan detachable; the Leitner Glacier Express then became the main way out of the base. Operates as a chondola (chair/gondola hybrid) in summer. Provides access to glacier-side terrain and easier runs than Olympic, along with better access to Whitehorn Lodge. Feeds into the Top of the World Express.